+34 913 408 851

info@arvengengineering.com
Análisis-de-Golpe-de-Ariete-y-Verificación-de-Soportes-Sistema-PCI-1.jpg

Description

Supports verification for the valve’s manifold of the new Spray Water Dilution System, fire protection of the Compressor PV-C-1, in the La Rábida refinery, Huelva.

A mechanical calculation was made with CAESAR II to evaluate the effects of the opening of the deluge valve (hydraulic forces in the elbows), obtaining the reactions in the manifold supports.