Project Info
Client
CONFIDENTIAL
Category
Detailed EngineeringLocation
Mendoza, Argentina.
Description
Detail engineering for the fabrication of three biphasic separators, SG-100, SG-101 and SV-106. The vessels were skid mounted. The scope of the project included from the design of the vessel, the associated pipelines, electricity, instrumentation and the actuators of the valves. The vessels were calculated according to the ASME VIII Div.1 code and the pipes in accordance with the ASME B31.3 code.