Project Info
Client
CONFIDENTIAL
Category
Specialized StudiesLocation
Murgados, Spain
Description
The objective of the project is to analyze the venting needs and maximum allowable working pressure of fifteen (15) storage tanks for the selection of new P/V valves.
Firstly, the inbreathing and outbreathing rates were obtained in accordance with API STD 2000 Seventh Edition; then, the maximum working pressure was obtained according to API STD 650 Twelfth Edition, Add. 3 of 2018.
Tanks evaluated have fixed roof, with diameters ranging from 55m to 8m, with heights from 22m to 10m respectively.